Commissioning
Independent design-stage commissioning of building systems, so owner requirements survive the design and are verifiable on site.
- Discipline
- Sustainability strategy
- Systems
- HVAC and chilled water, BMS and controls, Lighting and controls, Domestic hot water, Renewables (PV, solar thermal), Building envelope, Vertical transport, Life safety and smoke control
- Standards
- ASHRAE Guideline 0, ASHRAE Guideline 1.1, LEED EA prerequisite and enhanced Cx, Estidama Pearl Cx credits, Al Sa'fat Cx provisions, CIBSE commissioning codes
We make sure the systems you specified are the systems that get built and tested
A rating depends on commissioning that someone independent actually did.
Independent design-stage commissioning of the building systems: the assurance that owner requirements are carried through the design and are actually verifiable on site. Aligned to ASHRAE Guideline 0 and Guideline 1.1 and to the LEED, Estidama and Al Sa'fat commissioning provisions.
Fundamental commissioning is a prerequisite in LEED and enhanced commissioning adds credit points. Estidama Pearl commissioning credits require an independent commissioning authority appointed from design stage. Dubai Municipality's Al Sa'fat provisions are verified through the commissioning plan, specification and submittal package. Independent commissioning is the assurance a rating depends on, and the capability many teams lack in house.
Method
OPR and Basis of Design review, one independent review at each stage gate, commissioning plan and specification in the tender, and the evidence package for authority and certification. The animation illustrates the method, not project data.
Process
- 01OPR & Basis of Design
- 02Design-Stage Reviews
- 03Commissioning Plan
- 04Cx Specification
- 05Submittal & Package
What the client gets
- Owner's Project Requirements and Basis of Design review
- Review report at every design gate
- Commissioning plan and specification for the tender
- Submittal package for authority and certification
How we work
Four stages, from the first scope conversation to support through delivery. Each ends with something the design team can act on.
- 01
Capture the requirements
Write the Owner's Project Requirements and review the Basis of Design against them before the design is fixed.
- 02
Review at each gate
One independent commissioning review at every design stage gate, with an issues and comments log the team closes out.
- 03
Write it into the tender
Commissioning plan and specification: scope, roles, responsibilities and the verification strategy the contractor prices.
- 04
Compile the evidence
Design-stage commissioning report and submittal package for the authority and the certification.
Where this has been applied
Projects marked as Verdeon appointments were delivered under the firm’s own contract. The rest were led by Verdeon’s principals at previous firms and are shown as their experience.
Commission from the design stage, not after handover
Appoint the commissioning authority early and the rating, the specification and the site verification line up.